The same panel, a little more complete. Battery cabling done, etc. Batteries
are 4 Lifeline agm 8d's with 145 amp leece neville alternator and balmar
612 regulator, as well as link 20 monitor. I had no fear of the wiring
from the panel out, but this stuff, from batteries through here, to panel,
as well as regulators (2) , alternators (3 total), monitor, etc. would
have taken me forever to do with out Ted Carr, who methodically worked
his way through it. Next